water monitoring
ZR10 Double Tank Valve for water treatment

ZR10 Double Tank Valve

The ZR dual-vessel floating bed control valve integrates externally mounted inlet and discharge flow meters, enabling flow-based parameter configuration for all operational stages. During regeneration or cleaning cycles, the system closes the water output. Continues regeneration/cleaning until the control valve resets to the "Softening" position. Alternating regeneration between dual floating beds ensures uninterrupted water production. Stable water quality with constant pressure output, optimized for high-hardness water softening, like steam boiler systems, heating supply system and industrial process system.

SPECIFICATION

1. Microcomputer flat valve, ceramic wear-free seal;

2. Floating bed ion exchange, counter-current regeneration, dual tank alternating continuous water production, suitable for softening of high hardness water;

3. Under conditions where the source pressure is not high (0.05 MPa), the equipment can still normally absorb salt and work normally;

4. Dual mode of meter/timer, set operating parameters according to the hardness of raw water and on-site conditions, low salt consumption;

5. Humanized LCD screen with English operation interface, has power failure and water stop memory function.

ZR10 Double Tank Valve
ZR10 Double Tank Valve ZR10 Double Tank Valve

ZR10 Double Tank Valve

ZR10S Double Tank Valve

ZR10S Double Tank Valve

ZR10 double tank valve structure
ZR10 double tank valve structure
ZR10S double tank valve structure
ZR10S double tank valve structure
ZR10 double tank valve dimensions
ZR10 double tank valve dimensions
ZR10 double tank valve installation
ZR10 double tank valve installation
ZR10S double tank valve installation
ZR10S double tank valve installation
ZR10S double tank valve seat frame
ZR10S double tank valve seat frame
ZR10 double tank valve flow pressure curve
ZR10S double tank valve seat frame